+ Follow SINGAPOREAN AND JAPANESE Tag
Array
(
[results] => Array
(
[0] => Array
(
[ArticleID] => 93600
[Title] => Estrada opens work on P2-B NAIA-3 terminal
[Summary] =>
Work has started on a new P2-billion airport passenger terminal that will
replace the existing Ninoy Aquino International Airport (NAIA).
President Estrada led a consortium of German and Asian investors for the
groundbreaking ceremonies at the construction site inside Villamor Air Base in
Pasay City yesterday.
Known as NAIA-3, the terminal will be built over a period of three years on a
65-hectare property under a build-operate-transfer arrangement.
The building's roof will be "shaped like the outstretched wings of a bird in
flight, suggesting a country on the verge of ta
[DatePublished] => 2000-01-18 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] =>
[AuthorName] =>
[SectionName] => Headlines
[SectionUrl] => headlines
[URL] =>
)
)
)
SINGAPOREAN AND JAPANESE
Array
(
[results] => Array
(
[0] => Array
(
[ArticleID] => 93600
[Title] => Estrada opens work on P2-B NAIA-3 terminal
[Summary] =>
Work has started on a new P2-billion airport passenger terminal that will
replace the existing Ninoy Aquino International Airport (NAIA).
President Estrada led a consortium of German and Asian investors for the
groundbreaking ceremonies at the construction site inside Villamor Air Base in
Pasay City yesterday.
Known as NAIA-3, the terminal will be built over a period of three years on a
65-hectare property under a build-operate-transfer arrangement.
The building's roof will be "shaped like the outstretched wings of a bird in
flight, suggesting a country on the verge of ta
[DatePublished] => 2000-01-18 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] =>
[AuthorName] =>
[SectionName] => Headlines
[SectionUrl] => headlines
[URL] =>
)
)
)
abtest
January 18, 2000 - 12:00am