+ Follow HERMOSA-SAN JOSE Tag
Array
(
[results] => Array
(
[0] => Array
(
[ArticleID] => 1532986
[Title] => NGCP allots P8-B capex for 2016
[Summary] => The National Grid Corp. of the Philippines (NGCP) is allotting over P8 billion in capital expenditures for project expansions and upgrades as well as operational expenses in 2016.
[DatePublished] => 2015-12-15 09:00:00
[ColumnID] => 0
[Focus] => 0
[AuthorID] =>
[AuthorName] =>
[SectionName] => Business
[SectionUrl] => business
[URL] => http://media.philstar.com/images/the-philippine-star/nation/20140601/mindanao-power-grid.jpg
)
[1] => Array
(
[ArticleID] => 203568
[Title] => Transco completes P258-M project
[Summary] => The National Transmission Corp. (Transco) completed yesterday a P258-million project to relocate portions of three 230-kilovolt transmission lines in Bacolor, Pampanga which were adversely affected by heavy lahar flows from Mt. Pinatubo.
Transco vice president for engineering design and construction Winifredo SM. Pangilinan said the project used a so-called bored pile foundation technology which has deeper and stronger foundations suited for lahar conditions. Soil instability is a major technical challenge in lahar-filled transmission line routes.
[DatePublished] => 2003-04-24 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] =>
[AuthorName] =>
[SectionName] => Business
[SectionUrl] => business
[URL] =>
)
)
)
HERMOSA-SAN JOSE
Array
(
[results] => Array
(
[0] => Array
(
[ArticleID] => 1532986
[Title] => NGCP allots P8-B capex for 2016
[Summary] => The National Grid Corp. of the Philippines (NGCP) is allotting over P8 billion in capital expenditures for project expansions and upgrades as well as operational expenses in 2016.
[DatePublished] => 2015-12-15 09:00:00
[ColumnID] => 0
[Focus] => 0
[AuthorID] =>
[AuthorName] =>
[SectionName] => Business
[SectionUrl] => business
[URL] => http://media.philstar.com/images/the-philippine-star/nation/20140601/mindanao-power-grid.jpg
)
[1] => Array
(
[ArticleID] => 203568
[Title] => Transco completes P258-M project
[Summary] => The National Transmission Corp. (Transco) completed yesterday a P258-million project to relocate portions of three 230-kilovolt transmission lines in Bacolor, Pampanga which were adversely affected by heavy lahar flows from Mt. Pinatubo.
Transco vice president for engineering design and construction Winifredo SM. Pangilinan said the project used a so-called bored pile foundation technology which has deeper and stronger foundations suited for lahar conditions. Soil instability is a major technical challenge in lahar-filled transmission line routes.
[DatePublished] => 2003-04-24 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] =>
[AuthorName] =>
[SectionName] => Business
[SectionUrl] => business
[URL] =>
)
)
)
abtest
December 15, 2015 - 9:00am