+ Follow ENGINEER RIC Tag
Array
(
[results] => Array
(
[0] => Array
(
[ArticleID] => 1506100
[Title] => Ayala Bridge partially opened
[Summary] => After four days of being closed to vehicular traffic, the Department of Public Works and Highways (DPWH) announced that the Ayala Bridge was partially opened to light vehicles early yesterday morning.
[DatePublished] => 2015-10-01 10:00:00
[ColumnID] => 0
[Focus] => 0
[AuthorID] => 1096905
[AuthorName] => Evelyn Macairan
[SectionName] => Metro
[SectionUrl] => metro
[URL] =>
)
[1] => Array
(
[ArticleID] => 383967
[Title] => One lane of Ayala Bridge closed for repairs
[Summary] =>
The Department of Public Works and Highways (DPWH) has closed the southbound lane of Ayala Bridge for structural integrity repair, causing massive gridlock on streets near Malacañang Palace in Manila.
According to the DPWH National Capital Region office, the lane coming from the presidential palace has been closed since Monday for repair work that is expected to run two months.
[DatePublished] => 2007-02-08 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] =>
[AuthorName] =>
[SectionName] => Metro
[SectionUrl] => metro
[URL] =>
)
)
)
ENGINEER RIC
Array
(
[results] => Array
(
[0] => Array
(
[ArticleID] => 1506100
[Title] => Ayala Bridge partially opened
[Summary] => After four days of being closed to vehicular traffic, the Department of Public Works and Highways (DPWH) announced that the Ayala Bridge was partially opened to light vehicles early yesterday morning.
[DatePublished] => 2015-10-01 10:00:00
[ColumnID] => 0
[Focus] => 0
[AuthorID] => 1096905
[AuthorName] => Evelyn Macairan
[SectionName] => Metro
[SectionUrl] => metro
[URL] =>
)
[1] => Array
(
[ArticleID] => 383967
[Title] => One lane of Ayala Bridge closed for repairs
[Summary] =>
The Department of Public Works and Highways (DPWH) has closed the southbound lane of Ayala Bridge for structural integrity repair, causing massive gridlock on streets near Malacañang Palace in Manila.
According to the DPWH National Capital Region office, the lane coming from the presidential palace has been closed since Monday for repair work that is expected to run two months.
[DatePublished] => 2007-02-08 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] =>
[AuthorName] =>
[SectionName] => Metro
[SectionUrl] => metro
[URL] =>
)
)
)
abtest
February 8, 2007 - 12:00am