+ Follow ENGINEER ANTONIO NANGEL Tag
Array
(
[results] => Array
(
[0] => Array
(
[ArticleID] => 857634
[Title] => Masagana ang ani dahil kay Engineer Nangel
[Summary] => Kaya naman pala masagana ang ani ng mga magsasaka sa gitnang Luzon ay dahil masagana rin ang daloy ng patubig ng Department of Agriculture. Kaya matagumpay ang programa ni President Aquino sa masaganang ani.
[DatePublished] => 2012-10-09 00:00:00
[ColumnID] => 133167
[Focus] => 0
[AuthorID] => 1096526
[AuthorName] => Bening Batuigas
[SectionName] => PSN Opinyon
[SectionUrl] => opinyon
[URL] =>
)
[1] => Array
(
[ArticleID] => 739833
[Title] => P92-M aid distributed to Bulacan farmers, fishermen
[Summary] => The Department of Agriculture has distributed more than P92 million worth of assitance to farmers and fishermen in the province whose crops and fishponds were severely damaged by heavy flooding wrought by typhoons Pedring and Quiel.
[DatePublished] => 2011-10-22 12:43:20
[ColumnID] => 133272
[Focus] => 0
[AuthorID] =>
[AuthorName] =>
[SectionName] =>
[SectionUrl] =>
[URL] =>
)
[2] => Array
(
[ArticleID] => 355371
[Title] => FIRST IN 28 YEARS: Pantabangan Dam reservoir nearing spillway level
[Summary] => CABANATUAN CITY The giant Pantabangan Dam, which irrigates 102,000 hectares of agricultural lands in Central Luzon at full capacity, is nearing its spillway level of 221 meters, which could prompt the National Irrigation Administration (NIA) to release water to low-lying areas.
[DatePublished] => 2006-08-30 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] => 1097277
[AuthorName] => Manny Galvez
[SectionName] => Nation
[SectionUrl] => nation
[URL] =>
)
[3] => Array
(
[ArticleID] => 334549
[Title] => UPRIIS cuts off water from Pantabangan to rehabilitate two smaller dams
[Summary] => CABANATUAN CITY The National Irrigation Administrations (NIA) Upper Pampanga River Integrated Irrigation Systems (UPRIIS) shut down the intake gates at the reservoir of the Pantabangan Dam last Sunday, cutting off water from the dam to pave the way for the rehabilitation of two smaller dams.
Engineer Antonio Nangel, UPRIIS operations manager, said the water cut-off would enable them to undertake the rehabilitation of the Pampanga Bongabon River Irrigation System (PBRIS) and the Peñaranda River Irrigation Systems (Penris).
[DatePublished] => 2006-05-02 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] => 1097277
[AuthorName] => Manny Galvez
[SectionName] => Nation
[SectionUrl] => nation
[URL] =>
)
[4] => Array
(
[ArticleID] => 269132
[Title] => Postpone Nueva Ecija dam rehab, farmers urge
[Summary] => CABANATUAN CITY Some 18,000 farmers tilling 36,000 hectares of agricultural lands in Central Luzon stand to lose P2.1 billion in potential income if the National Irrigation Administration (NIA) pushes through with the scheduled rehabilitation of the Atate Dam in Palayan City in December, a top official of the agency said.
Engineer Antonio Nangel, operations manager of the NIAs Upper Pampanga River Integrated Irrigation Systems (UPRIIS), said the farmers want the rehabilitation deferred to allow them to plant during the dry cropping season next year.
[DatePublished] => 2005-03-06 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] => 1097277
[AuthorName] => Manny Galvez
[SectionName] => Nation
[SectionUrl] => nation
[URL] =>
)
[5] => Array
(
[ArticleID] => 269256
[Title] => Postpone Nueva Ecija dam rehab, farmers urge
[Summary] => CABANATUAN CITY Some 18,000 farmers tilling 36,000 hectares of agricultural lands in Central Luzon stand to lose P2.1 billion in potential income if the National Irrigation Administration (NIA) pushes through with the scheduled rehabilitation of the Atate Dam in Palayan City in December, a top official of the agency said.
Engineer Antonio Nangel, operations manager of the NIAs Upper Pampanga River Integrated Irrigation Systems (UPRIIS), said the farmers want the rehabilitation deferred to allow them to plant during the dry cropping season next year.
[DatePublished] => 2005-03-06 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] => 1097277
[AuthorName] => Manny Galvez
[SectionName] => Nation
[SectionUrl] => nation
[URL] =>
)
[6] => Array
(
[ArticleID] => 99139
[Title] => Farmers in 3 provinces pin hopes on P4.9-B dam
[Summary] =>
GAPAN, Nueva Ecija -- A proposed giant dam situated near an illegal logging
zone in the province is being hailed as the ultimate solution to the growing
demand for irrigation water of some 10,000 farmers in Central Luzon.
The P4.9-billion Balintingon Reservoir Multipurpose Project (BRMPP) located in
the tri-boundaries of Nueva Ecija, Bulacan and Pampanga and whose proposed
water supply is the notorious Sumacbao River, could solve the perennial
irrigation woes of farmers in 11 municipalities in southern Nueva Ecija, San
Ildefonso, San Miguel and San Rafael in Bulacan and Arayat i
[DatePublished] => 2000-05-21 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] => 1097277
[AuthorName] => Manny Galvez
[SectionName] => Business
[SectionUrl] => business
[URL] =>
)
)
)
ENGINEER ANTONIO NANGEL
Array
(
[results] => Array
(
[0] => Array
(
[ArticleID] => 857634
[Title] => Masagana ang ani dahil kay Engineer Nangel
[Summary] => Kaya naman pala masagana ang ani ng mga magsasaka sa gitnang Luzon ay dahil masagana rin ang daloy ng patubig ng Department of Agriculture. Kaya matagumpay ang programa ni President Aquino sa masaganang ani.
[DatePublished] => 2012-10-09 00:00:00
[ColumnID] => 133167
[Focus] => 0
[AuthorID] => 1096526
[AuthorName] => Bening Batuigas
[SectionName] => PSN Opinyon
[SectionUrl] => opinyon
[URL] =>
)
[1] => Array
(
[ArticleID] => 739833
[Title] => P92-M aid distributed to Bulacan farmers, fishermen
[Summary] => The Department of Agriculture has distributed more than P92 million worth of assitance to farmers and fishermen in the province whose crops and fishponds were severely damaged by heavy flooding wrought by typhoons Pedring and Quiel.
[DatePublished] => 2011-10-22 12:43:20
[ColumnID] => 133272
[Focus] => 0
[AuthorID] =>
[AuthorName] =>
[SectionName] =>
[SectionUrl] =>
[URL] =>
)
[2] => Array
(
[ArticleID] => 355371
[Title] => FIRST IN 28 YEARS: Pantabangan Dam reservoir nearing spillway level
[Summary] => CABANATUAN CITY The giant Pantabangan Dam, which irrigates 102,000 hectares of agricultural lands in Central Luzon at full capacity, is nearing its spillway level of 221 meters, which could prompt the National Irrigation Administration (NIA) to release water to low-lying areas.
[DatePublished] => 2006-08-30 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] => 1097277
[AuthorName] => Manny Galvez
[SectionName] => Nation
[SectionUrl] => nation
[URL] =>
)
[3] => Array
(
[ArticleID] => 334549
[Title] => UPRIIS cuts off water from Pantabangan to rehabilitate two smaller dams
[Summary] => CABANATUAN CITY The National Irrigation Administrations (NIA) Upper Pampanga River Integrated Irrigation Systems (UPRIIS) shut down the intake gates at the reservoir of the Pantabangan Dam last Sunday, cutting off water from the dam to pave the way for the rehabilitation of two smaller dams.
Engineer Antonio Nangel, UPRIIS operations manager, said the water cut-off would enable them to undertake the rehabilitation of the Pampanga Bongabon River Irrigation System (PBRIS) and the Peñaranda River Irrigation Systems (Penris).
[DatePublished] => 2006-05-02 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] => 1097277
[AuthorName] => Manny Galvez
[SectionName] => Nation
[SectionUrl] => nation
[URL] =>
)
[4] => Array
(
[ArticleID] => 269132
[Title] => Postpone Nueva Ecija dam rehab, farmers urge
[Summary] => CABANATUAN CITY Some 18,000 farmers tilling 36,000 hectares of agricultural lands in Central Luzon stand to lose P2.1 billion in potential income if the National Irrigation Administration (NIA) pushes through with the scheduled rehabilitation of the Atate Dam in Palayan City in December, a top official of the agency said.
Engineer Antonio Nangel, operations manager of the NIAs Upper Pampanga River Integrated Irrigation Systems (UPRIIS), said the farmers want the rehabilitation deferred to allow them to plant during the dry cropping season next year.
[DatePublished] => 2005-03-06 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] => 1097277
[AuthorName] => Manny Galvez
[SectionName] => Nation
[SectionUrl] => nation
[URL] =>
)
[5] => Array
(
[ArticleID] => 269256
[Title] => Postpone Nueva Ecija dam rehab, farmers urge
[Summary] => CABANATUAN CITY Some 18,000 farmers tilling 36,000 hectares of agricultural lands in Central Luzon stand to lose P2.1 billion in potential income if the National Irrigation Administration (NIA) pushes through with the scheduled rehabilitation of the Atate Dam in Palayan City in December, a top official of the agency said.
Engineer Antonio Nangel, operations manager of the NIAs Upper Pampanga River Integrated Irrigation Systems (UPRIIS), said the farmers want the rehabilitation deferred to allow them to plant during the dry cropping season next year.
[DatePublished] => 2005-03-06 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] => 1097277
[AuthorName] => Manny Galvez
[SectionName] => Nation
[SectionUrl] => nation
[URL] =>
)
[6] => Array
(
[ArticleID] => 99139
[Title] => Farmers in 3 provinces pin hopes on P4.9-B dam
[Summary] =>
GAPAN, Nueva Ecija -- A proposed giant dam situated near an illegal logging
zone in the province is being hailed as the ultimate solution to the growing
demand for irrigation water of some 10,000 farmers in Central Luzon.
The P4.9-billion Balintingon Reservoir Multipurpose Project (BRMPP) located in
the tri-boundaries of Nueva Ecija, Bulacan and Pampanga and whose proposed
water supply is the notorious Sumacbao River, could solve the perennial
irrigation woes of farmers in 11 municipalities in southern Nueva Ecija, San
Ildefonso, San Miguel and San Rafael in Bulacan and Arayat i
[DatePublished] => 2000-05-21 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] => 1097277
[AuthorName] => Manny Galvez
[SectionName] => Business
[SectionUrl] => business
[URL] =>
)
)
)
abtest
October 22, 2011 - 12:43pm